Product Carbon Footprint

What is an EPD? What manufacturers should prepare for it

The EU's new Construction Products Regulation makes climate impact part of product information. Here is what an EPD is, how it relates to ISO 14025 and EN 15804, and how a manufacturer in Türkiye can start collecting the data.

Updated: 7 November 2026 The figures and legal references on this page are based on official/primary sources.

What is an EPD? What manufacturers should prepare for it

A manufacturer of ceramic tile adhesive receives a tender document from a European buyer with a new line in it: “Please send the EPD of your product.” Some companies see that line for the first time. Others have been chasing the document for months. An EPD, or Environmental Product Declaration, is an independently verified document that describes a product’s environmental impact, from raw materials to the factory gate, in a standard format.

Demand for it is rising because the EU’s new Construction Products Regulation (Regulation (EU) 2024/3110) turns environmental performance into part of product information. This article explains what an EPD is, which standards sit behind it, how the regulation’s timeline works, and where a manufacturer can begin.

What exactly is an EPD?

An EPD reports a product’s environmental impact using measured data. The indicators include contribution to climate change (kg CO2 equivalent), energy and water use, and waste. A programme operator publishes the declaration and an independent verifier checks it.

It is not a marketing brochure. The calculation method, the system boundaries and the assumptions are written into the document. A buyer can put two EPDs side by side and compare them, because both follow the same rules.

Which standards does it rest on?

Three names are enough to know:

  • ISO 14040 and ISO 14044 define the life cycle assessment (LCA) method. The numbers in an EPD come from this calculation.
  • ISO 14025 sets the rules for third-party verified environmental declarations.
  • EN 15804 provides the common product category rules for construction products. A manufacturer selling into the construction sector prepares its EPD under this standard.

Product category rules (PCR) define the boundaries within which each product type is calculated. Two companies in the same category use the same rules, so their results can be compared.

What does the Construction Products Regulation change?

The regulation was published in the Official Journal of the EU on 18 December 2024. According to its text, most of it has applied since 8 January 2026. The penalties provision (Article 92) applies from 8 January 2027.

Product-level obligations phase in more gradually. The recitals state that obligations for a product family should become mandatory 12 months after the relevant harmonised technical specification takes effect. Each product group’s date therefore depends on its own standard. The digital product passport follows a similar logic. The manufacturer must provide it 18 months after the relevant delegated act enters into force.

For a firm date, check the status of the harmonised standard for your product family and the Commission’s acts in the Official Journal. Some summary websites claim that everything became mandatory in 2026. That does not match the regulation’s phased structure.

Why should a manufacturer in Türkiye care?

A company exporting cement, ceramics, insulation, paint, metal profiles or construction chemicals to the EU may count as the party placing the product on the market, and so be addressed by this regulation. Even without direct sales, a European distributor will ask you for data to meet its own obligations.

The market is moving too. Green building rating systems such as LEED and BREEAM use EN 15804 EPDs when scoring projects. A contractor who wins a tender needs documented products from suppliers to specify them.

How does EPD preparation proceed?

The process differs by company, but the skeleton is usually this:

  1. Choose the scope. For which product or product family will you obtain an EPD? If you have many variants, a representative product or a weighted average may be allowed. The PCR sets the rule.
  2. Select the programme operator and PCR. This affects validity period and verification terms. The validity varies by programme and is commonly five years. Confirm it against the rules of the programme you choose.
  3. Collect the data. Over one production year you need raw material quantities, electricity and fuel use, water, scrap and waste, packaging and transport distances.
  4. Run the LCA. An LCA consultant usually does this, while the company supplies data and site access.
  5. Independent verification. The verifier checks both the calculation and the document.
  6. Publish and keep it current. Renew the declaration before it expires or when production changes.

The hard part is data, not the calculation

In EPD projects, the formula is rarely what drags things out. Invoices, meter readings and production records sit in different places. Raw material purchases are in the ERP, energy bills are in accounting, scrap rates are in a shift logbook. The LCA specialist spends weeks stitching these together.

A company that keeps its data tidy from the start has an advantage. If you record raw material use per product, energy and water meters per plant and line, scrap and waste, and shipping distances, most of the EPD data is already in hand. The same data also feeds carbon footprint calculations and CBAM preparation. Data collected correctly once serves three different documents.

For the digital side of product information, see our article on the digital product passport.

How long does it take and what does it cost?

Time and cost vary widely with the number of products, the state of your data and the programme chosen. For a single product family with ready data, a few months may be enough. If data is scattered, it takes longer. Cost is made up of consulting, verification and programme fees, and quoting a fixed figure would be misleading. Get quotes from several providers and compare the scope in writing. Check current fees on the programme operator’s website as well.

How does İkiz Eksen help?

At İkiz Eksen we start from measurement. First we look at where production and energy data sit, and list missing meters and gaps in records. Then we set that data to flow cleanly through the ERP and reporting layer. We draw on the ERP experience Qera has built across 550+ customers and 15+ sectors. The infrastructure runs on Microsoft Azure, and we deliver turnkey projects across Türkiye. The LCA calculation and verification are carried out with accredited specialists.

If you are unsure which of your products will need an EPD, browse our solutions or get in touch. To plan digital and green work together, our twin transition page outlines the roadmap.

Frequently Asked Questions

Is an EPD mandatory?

We are not aware of a general EPD obligation in Turkish legislation. On the EU side, the Construction Products Regulation brings climate impact into product documentation, with timing phased by product family. In practice, buyers and tender documents often ask for the document before the regulation requires it.

Is an EPD the same as a carbon footprint?

No. A carbon footprint measures one indicator, climate impact. An EPD reports climate impact alongside energy, water, waste and other indicators, in a verified standard format.

Do I need a separate EPD for every product?

Not always. PCR rules may allow similar products to be declared as a group or through a representative product. The rules of your chosen programme decide which products can share one declaration.

Can a small company get an EPD?

Yes. Company size is not a condition. Data and verification are. If your data is in order, the process is shorter and cheaper.

Where should we start?

With a product choice and a one-year breakdown of raw material, energy, water and scrap data. With that breakdown ready, the scoping conversation with a consultant is much clearer.

The dates in this article rely on the text of Regulation (EU) 2024/3110 as published in the Official Journal of the EU. Confirm the timeline for your product group and programme fees with official sources and your advisor.

Share on LinkedIn

Related posts

This content is informational; confirm official regulation and incentive terms from primary sources (the relevant authority / Official Gazette).